彰濱工業區汙水處理廠
Changhua Coastal Industrial Park,Sewage treatment plant
1/1
地點|台灣彰化
用途|廠房
業主|中興工程顧問股份有限公司
建築規模|地上3層,地下1層
總樓地板面積|3,539.55m2
完工時間|2011
Location|Changhua, Taiwan
Use|Factory
Builder|Sinotech Engineering Consultants, LTD.
Structure |3 levels aboveground, 1 level underground
Total Floor Area|3,539.55m2
Completion|2011
基於環保節能與科技並行的理念而誕生,以簡潔垂直與水平脈絡的廠房設計,採用單純極簡形式和現代化的材料,極具現代感的外形,表現時尚風潮。
Conceived in the concept of environmental protection and energy saving technology in conjunction with a simple vertical and horizontal approach to the plant design. Extensive use of pure minimalist forms and modern materials to yield a very modern appearance that exudes fashion and style.